A short NWP freight trundles over the Petaluma River swing bridge on its way to Ignacio. Alignment issues with the 106-year old bridge delayed the train until after the sun had dipped behind the m... (more)
NWP 1501 heads east through the marsh at Black Point, bound for the CFNR interchange at Lombard.
This image shows the first freight operation for the Northwestern Pacific Railroad in over a decade, as it crosses the Petaluma River swing bridge en route to a feed mill in Petaluma. One of the ... (more)
The SP is no longer running trains on the old NWP, as the California Northern has taken over. The CFNR leased several SP locomotives to get things rolling, yet as you can see by the 2nd unit, the ... (more)